All fibre cement ridges
Two-piece fibre cement ridges
All fibre cement barge boards
Straight fibre cement barge boards
Cranked fibre cement barge boards
Finials
All fibre cement finials



Movement joints
Straight movement joints
Used to allow a movement and expansion break in larger buildings. Where a movement joint is required, the full EUROSIX sheet beneath it should be cut along the centre of its valley with a space of 25mm to 30mm. Recommended spacing for Movement Joints are:
- Buildings with a length of 45 metres or less do not need a Movement Joint.
- Buildings with a length of 45 metres – 75 metres require one run of Movement Joints.
- Another Movement Joint will be required every additional 30 metres.
- Movement Joints require a minimum end lap of 150mm.
- Movement Joints are fixed directly into purlins (not through sheets)
- Fixings should go through the centre point of the Movement Joints at each Purlin position.







Cranked movement joints
Fixed on the ridge detail to overlap the top end detail of a straight Movement Joint.
Fixings specification is the same as straight movement joints.







Two-piece movement joint ridge
This is a flexible 2 piece movement joint ridge section which adjusts to fit at the crown of a duo-pitch roof.







Movement joint stopend
Used to close the open end of a straight Movement Joint at the eaves.







Eaves-Apron Accessories

Eave closure
Closes the corrugation and/or insulated space at eaves detail and into gutter.
Net Cover: 1016mm

Eave filler
Closes corrugation at eaves of single skin cladding
Net Cover: 1016mm

Apron flashing
Used at the junction detail where vertical and standard pitched roofs meet
Net Cover: 1016mm